Open bid
Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1
Cobb County · posted on Georgia Procurement Registry
Key dates
Bids due
Thu, Nov 12, 2026
Check the bid's documents for the time.
5 days
from today, Sat, Nov 7
What this bid asks
- BondsNot confirmedCheck the bid's documents for bonds
- Pre-bid meetingNot confirmed
- How it goes inNot confirmed
- Addenda1 postedas of Sat, Nov 7, 2026, 5:48 AM ET
Where the work is
Key facts
- County
- Cobb
- Due
- Nov 12, 2026 (time not listed). Check the bid's documents for the time.
- Source
- Open the listing (GA registry)
Saved bid
Save this bid to put its deadline on your calendar in My account.
Fit
Is this bid for me?
The reasons, not a verdict: distance from your counties.
What changed
1 addendum posted on this bid. The latest was copied Nov 3, 2026, 5:51 AM ET.
Bonds
No bid, performance or payment bond is named in the documents we hold. A bond not named here may still be required: read the documents.
Questions to ask
4 places in the documents worth a question to the agency, each drafted with the agency's own words and the page.
See the questions You send them. We never do.
The agency’s documents
2 files, as the agency posted them. Each Download opens the agency’s own file. We also keep each as an unchanged copy, under Copy details.
- Download: B2464 Factory Shoals Ped Bridge _ RFQ.pdf
B2464 Factory Shoals Ped Bridge _ RFQ.pdf
Copy on GovRoute · PDF · 896 KB · Copied Oct 18
Copy details: B2464 Factory Shoals Ped Bridge _ RFQ.pdf
An unchanged copy of the agency’s file, made Sun, Oct 18, 2026, 6:10 AM ET. Fingerprint (SHA-256) 6f459174…1fd2.
- Download: B2464 Factory Shoals Ped Bridge _ Addendum 1.pdf
B2464 Factory Shoals Ped Bridge _ Addendum 1.pdf Addendum Newest
Copy on GovRoute · PDF · 320 KB · Copied Nov 3
Copy details: B2464 Factory Shoals Ped Bridge _ Addendum 1.pdf
An unchanged copy of the agency’s file, made Tue, Nov 3, 2026, 5:51 AM ET. Fingerprint (SHA-256) 62b6d9ae…1cec.
Open our copy: B2464 Factory Shoals Ped Bridge _ Addendum 1.pdf
Request removal: B2464 Factory Shoals Ped Bridge _ Addendum 1.pdf
1 addendum posted as of our last check, Sat, Nov 7, 2026, 5:48 AM ET. We check every day.
More open bids nearby
Other open engineering bids in Cobb County and counties within 50 miles
- On-Call Geotechnical Services Dawson County · Due Nov 12 (time not listed)
- Engineering and Design Services for Gardner Road Bridge Henry County · Due Nov 19 (time not listed)
- Architectural, Engineering, Design and Construction Phase Services City of Atlanta · Due Nov 23 (time not listed)
- 2026-09 Engineering Services City of Hampton · Due Dec 1 (time not listed)
- - 002 Professional Engineering Services City of Jasper · Due Dec 1 (time not listed)