Open bid
Fire Protection
Georgia World Congress Center Authority · posted on Georgia Procurement Registry
Key dates
Pre-bid meeting
The mandatory pre-bid meeting has passed.
Bids due
Wed, Nov 11, 2026
Check the bid's documents for the time.
4 days
from today, Sat, Nov 7
What this bid asks
- BondsRequiredPerformance bond · page 10
- Pre-bid meetingRequiredAddendum One.pdf
… 1 Georgia World Congress Center Authority (GWCCA) Subject: Pre-Bid Conference Attendance Requirement The Georgia World Congress Center Authority (GWCCA) hereby issues this addendum to clarify the pre-bid conference attendance requirement.
- How it goes inNot confirmed
- Addenda3 postedas of Sat, Nov 7, 2026, 6:38 AM ET
Key facts
- Location
- Not in the listing we read. Check the bid documents for the job site.
- Due
- Nov 11, 2026 (time not listed). Check the bid's documents for the time.
- Source
- Open the listing (GA registry)
Saved bid
Save this bid to put its deadline on your calendar in My account.
Fit
Is this bid for me?
The reasons, not a verdict: distance from your counties.
What changed
3 addenda posted on this bid. The latest was copied Nov 5, 2026, 5:55 AM ET.
Bonds
- Bid bondCheck the documents
-
Performance bond100%
RFP Building C Fire Pump Replacement.pdf, page 10 · copied Oct 28, 2026
The agency's sentence
… Proposer shall furnish a performance bond or clean, irrevocable letter of credit in an amount equal to one hundred percent (100%) of the total Contract …
- Payment bondCheck the documents
The agency's own words, from the documents it posted. Not named here doesn't mean not required: read the documents. Bond details
Questions to ask
1 place in the documents worth a question to the agency, each drafted with the agency's own words and the page.
See the questions You send them. We never do.
The agency’s documents
4 files, as the agency posted them. Each Download opens the agency’s own file. We also keep 2 as unchanged copies, under Copy details.
- Download: RFP Building C Fire Pump Replacement.pdf
RFP Building C Fire Pump Replacement.pdf
Copy on GovRoute · PDF · 316 KB · Copied Oct 28
Copy details: RFP Building C Fire Pump Replacement.pdf
An unchanged copy of the agency’s file, made Wed, Oct 28, 2026, 5:54 AM ET. Fingerprint (SHA-256) 71ebee03…9be6.
- Download: GWCC Fire Pump Pricing.xlsx
GWCC Fire Pump Pricing.xlsx Addendum
Link only · XLSX · 10 KB · Checked Nov 3
A spreadsheet can’t be checked for such a notice, so we link to the agency’s file.
- Download: Addendum One.pdf
Addendum One.pdf Addendum
Copy on GovRoute · PDF · 91 KB · Copied Nov 3
Copy details: Addendum One.pdf
An unchanged copy of the agency’s file, made Tue, Nov 3, 2026, 5:56 AM ET. Fingerprint (SHA-256) 22e3850a…20e6.
- Download: Sign in Sheet.pdf
Sign in Sheet.pdf Addendum Newest
Link only · PDF · 619 KB · Checked Nov 5
We couldn’t check this file for a notice against copying, so we link to the agency’s file.
3 addenda posted as of our last check, Sat, Nov 7, 2026, 6:38 AM ET. We check every day.